Zurück zum Profil
Hammerschmid, Pachl, Seebacher - Architekten

Annakapelle

2011
Schladming
Bauzeit: 8 Monate


The revitalization of the cemetery chapel from the 14th century includes the restoration of the ossuary in the lower chapel, and the adaptation of the upper chapel into a cultural space. The project includes an intensive examination of the historical use  and the architectural significance of the building.
The church square as the threshold between public space, church and cemetery in the area becomes an major importance.